The Addition of the PAMS-2 Post-Accident Monitoring Systems at Dukovany NPP

Implementation Period
2019-2021
Client/Contracting Authority
ČEZ, a.s., Czech Republic
Location/End User
Dukovany NPP, Czech Republic

As part of the post-Fukushima measures, Dukovany NPP decided to upgrade its post-accident monitoring system. VF got the contract for the following safety related systems for all four reactor units:

  • Steam generator blowdown volumetric activity monitoring
  • Cooling water volumetric activity monitoring
  • Modernisation of the in-reactor water level measuring system and flowrate measurements downstream from the emergency feed pumps.
Hlavní nabídka About us
cz | en | ru